Monday, May 28, 2007

Stage 9-
Sarking and insulation was added to the roof and walls.
Stage 8-
By etching aluminium sheets I was able to achieve the same look as titanium plates. The sheets were then pot riveted onto the columns.
Stage 7-
The corrugated iron was cut to size then tacked to the rafter and the purlins. Flashing was also bent to place over the rafter.
Stage 6-
The purlins were again cut to size, then welded to the rafter
Stage 5-
The bracing was cut to size then was welded into place between the girts and secondary railing channel
Stage 4-
The two rafters which are attached to the top of the circular hollow section and the i beams, were cut to size then welded togther to make an i beam. The rafters were then attached to the top of the columns.
Stage 3-
The secondary channel railing was cut to size in 1 metre sections then welded to the girts