skip to main | skip to sidebar

Monday, May 28, 2007

Stage 6-
The purlins were again cut to size, then welded to the rafter
Posted by Alex Dickson at 5:51 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Construction

Blog Archive

  • ▼  2007 (23)
    • ▼  May (17)
      • Site Visit: Completed building Narana Creations ce...
      • Site visit: Under construction Location and Buildi...
      • Site visit:Completed building- Building and Locati...
      • Site visit:Currently under constructionLocation: S...
      • Site Visit:Currently under construction-Location: ...
      • Final:These are images of my completed model and m...
      • Stage 9-Sarking and insulation was added to the ro...
      • Stage 8- By etching aluminium sheets I was able to...
      • Stage 7-The corrugated iron was cut to size then t...
      • Stage 6-The purlins were again cut to size, then w...
      • Stage 5-The bracing was cut to size then was welde...
      • Stage 4-The two rafters which are attached to the ...
      • Stage 3-The secondary channel railing was cut to s...
      • Stage 2-The 10 girts were bent to shape to curve a...
      • Stage 1-Consisted of cutting the steel into sectio...
      • Article 5 and 6 relating to current events in cons...
      • Development workThese sketches represent more refi...
    • ►  April (3)
    • ►  March (3)

About Me

Alex Dickson
View my complete profile