Monday, May 28, 2007
Stage 5-
The bracing was cut to size then was welded into place between the girts and secondary railing channel
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Construction
Blog Archive
▼
2007
(23)
▼
May
(17)
Site Visit: Completed building Narana Creations ce...
Site visit: Under construction Location and Buildi...
Site visit:Completed building- Building and Locati...
Site visit:Currently under constructionLocation: S...
Site Visit:Currently under construction-Location: ...
Final:These are images of my completed model and m...
Stage 9-Sarking and insulation was added to the ro...
Stage 8- By etching aluminium sheets I was able to...
Stage 7-The corrugated iron was cut to size then t...
Stage 6-The purlins were again cut to size, then w...
Stage 5-The bracing was cut to size then was welde...
Stage 4-The two rafters which are attached to the ...
Stage 3-The secondary channel railing was cut to s...
Stage 2-The 10 girts were bent to shape to curve a...
Stage 1-Consisted of cutting the steel into sectio...
Article 5 and 6 relating to current events in cons...
Development workThese sketches represent more refi...
►
April
(3)
►
March
(3)
About Me
Alex Dickson
View my complete profile
No comments:
Post a Comment