Week 4 : (Store/ Warehouse Section)
This week our task was draw a scetion through a potal frame warehouse with a shop front connected. Our task was to understand the connection between the two that they are seperate structures because of fire issues . The structure also has a suspended slab a composite structure where steel and concrete are used together . This system maximises the properties of both concrete and steel; as steel peforms best in tension and concrete performs best in compression.
Article 2-relating to a current event in construction:
Sunday, March 25, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment